ESS Cabinet Terminal Assembly — SY-ESS02
Product visual — replace with photography
Minimum orderNegotiated per drawing
Lead time30-45 days
Energy-Storage Wiring SY-ESS02

ESS Cabinet Terminal Assembly

Terminal assemblies and looms for energy-storage cabinets and inverters — heavy-gauge lugs, heat-shrink finishing and labelled routing, produced and tested as a set.

  • Complete looms for ESS cabinets, inverters and PDU panels
  • Heavy-gauge conductors with compression lugs, heat-shrink finished
  • Labelled, sleeved and routed per harness board for error-free installation
  • Pulled and crimped with documented pull-force checks
  • Sample approval and pilot run before mass production
  • Long-term supply programmes for ESS integrators and inverter brands
CustomisationLogo, colour, packaging
CertificationUL, RoHS

Specification

Technical details

Figures below are measured on production samples. Tell us your target market and we will confirm the certification set required for import.

Ask a technical question
ApplicationESS cabinets, inverters, PDU panels
Wire Gauge6AWG – 2/0AWG
LugsCompression copper lugs, tinned
FinishingHeat-shrink, sleeving, labelling
ProcessHarness board, built to drawing
Testing100% continuity + hi-pot + pull-force sample
MOQ ProcessSample approval, then pilot run
CertificationUL, RoHS